Product Details

Roller pressing machinery/food /instant noodle processing line

Place of Origin Shandong, China
Brand Name LD
Certification CE,ISO
Model Number 1 Piece Roller pressing machinery/food /instant noodle processing line
Min.Order Quantity 1set
Price US$1000.00-USD800,000.00
Packaging Details standard package
Delivery Time Within 5 worldLDs
Payment Terms T/T,Western Union
Supply Ability 154

Product Features

Roller pressing machinery/food /instant noodle processing line -15154158335 Roller pressing machinery/food /instant noodle processing lineRoller pressing machinery/food /instant noodle processing line

Product Description

Detail information:

1. Roller pressing machinery: Noodle diameter:1.2-1.5mm; speed:28-29Hz

2. Boiling machinery: Boiling time:8Hz/1400 r/min; Boiling temperature:110°C

3. Frying machinery: Frying temperature:140°C; Frying time:1-1.5min; Oil reservoir:700-1000kg palm oil

4. Packaging LDine:Model:350 LLDe; Output:80 package/minutes; Weight:60-80grams/bag(60gram is double level noodle; 80gram is single level noodle)

5. Worker: there need 4-6 people for the whole production line withpackthe noodle.

Technical parameter

Model

XBF-III

Electrical

XBF-III

Steam

Installed Capacity

154kw

4.2kw

Steam pressure

1.5kg/cm
²

6kg/cm²

Acting width

210mm

210mm

Output

11000pcs/8h

11000pcs/8h

26000*700*1500mm

26000*700*1500mm

The production process flow:

Mixer(dough maker)---shaping(roller pressing machinery)---boiling---cutting---frying(electric fryer/steam fryer)---cooling ---Pack

Roller pressing machinery/food /instant noodle processing lineRoller pressing machinery/food /instant noodle processing line

Packaging & Shipping

Payment term:

1. 40% of total payment as the deposit,we will finish the machinery within 40 LDs.

2. 60% of total payment before make very the Equipment to Buyer`s plant.

Package: Wooden pallet for export, fit for multiple handing and long distance marine shipping.

very time: Seller should get all the goods realt and ship the goods to the destination port within 40 LDs after receiving the total amount price.

Our Services

quality guarantee terms: Equipment shall be guaranteed 12 month, without destroyed by some people. Enclosed the whole line, we will give you some LDare parts, such as heating ring, LDanner, etc. for free. The LDare parts shall be supplied at preferential price for an extended long time.

Installation and training: we will send our engineer to install and train in your company on

condition that you should supply the go and return air tickets, the accommodation, the food for our engineers and also pay USD50 each person per LD.

Roller pressing machinery/food /instant noodle processing lineRoller pressing machinery/food /instant noodle processing lineRoller pressing machinery/food /instant noodle processing lineRoller pressing machinery/food /instant noodle processing lineRoller pressing machinery/food /instant noodle processing lineRoller pressing machinery/food /instant noodle processing lineRoller pressing machinery/food /instant noodle processing lineRoller pressing machinery/food /instant noodle processing line

All Products Contact Now